Langosteira gallery | Ports
Project description
Execution of 2,000 ml of reinforced concrete gallery parallel to the main dock of the Outer Port in order to protect the oil transport pipelines in the outer port of A Coruña.
It includes:
Strongly reinforced concrete footings in large volumes where a very good movement of the concrete is required to fill the entire confined space of the footing where there is great difficulty in vibrating due to its high density of reinforcement.
Pillars, where the pumping of the concrete is very important, since the pillars are more than 10 meters high.
Closing of the gallery structure is the upper floor (with placement on a sliding carriage) and it must be capable of having a self-supporting capacity.